1. Home
  2. Topics
  3. Pipeline

Pipeline

ARTICLE 11/29/2025

Reliability Study Examines Slow Crack Growth and Burial Design Impact on HDPE Pipelines

A new reliability study from Universidad Nacional de Colombia analyzes how slow crack growth (SCG) and burial design variables—such as soil class, depth of cover, and trench width—affect the long-term performance of HDPE pipelines. Using Monte Carlo simulations and machine learning, researchers identify key factors influencing pipeline failure risk.

NEWS 11/25/2025

Elevation Extends Open Season for DJ South Gathering Pipeline

Elevation Midstream has extended the open season for its DJ South Gathering crude pipeline, giving shippers until Jan. 15 to secure capacity on the planned system connecting Adams and Arapahoe Counties to key delivery points in Weld County. The project aims to boost crude gathering reliability across Colorado’s DJ Basin.